1 X-Cell Fury Tempest 3D Instruction Manual Miniature Aircraft p/n #123-100A
10 - Medium Pitch to Flybar The following Mixing Ratios are possible with the combination of positions chosen: Flybar Tube Control Ball
11 Step 3: Installing the Upper Head Block Assembly Parts Required: Bag# 1 #122-14 Upper Head Block 1A 1 #122-17
12 NOTE: Two different hardness of o-rings dampeners and three sets of shim thickness are included. The specific dampening may vary depen
13 C. Repeat step AB@ on the opposite end of the Head Axle. Tighten both #0086 bolts using two 4mm Allen wrenches. D. Slide one #122-1
14 II. BUILDING THE LEFT MAIN FRAME Bags Required: #2A, #2B, and #3D Tools or Materials Required: M2.5 Allen Tool M5.5 (7/32
15 D. Install the #115-12 Vertical Front Channel using one #0061 M3 x 8 Socket Head Bolt, one #0063 M3 x 10 Socket Head Bolt and one #00
16 III. INSTALLING THE MAIN SHAFT, MAIN GEAR AND FRONT TAIL DRIVE Bags Required: #3A, #3B, #3C, #7D Tools or Materials Required: M
17 Step 2: Assemble the Constant Drive Autorotation Upper Section Parts Required: Bag# 8 #0088-1 M3x5 flat head scr
18 Step 4: Installing the Main Shaft and Main Gear/Autorotation Assembly Parts Required: Bag# 1 #0057 M4x4 socket head s
19 O-rings, and the shim(s). Apply a little grease to each side of the shim(s) and reinstall all items except the dowel pin. NOTE: Conce
2 R/C HELICOPTER SAFETY A radio-controlled model helicopter is a technically complex device that must be built and operated with care. I
20 IV. BUILDING AND INSTALLING THE RADIO SUPPORT ASSEMBLY Bags Required: #4A, #4B Tools or Materials Required: M2.0 and 2.5
21 B. Select the #115-28 Radio/battery Plate, the #115-30 Velcro Strip, two #0840-31 M3x16 Button Head Bolts, two #115-32 Plastic Spacer
22 V. INSTALLING THE RIGHT MAIN FRAME, BELL CRANKS AND GYRO BRACKETS Bags Required: #5A through #5E Tools or Materials Required:
23 Step 2: Installing the Right Main Frame Parts Required: Bag # 1 #0064 M3x8 Button Head Socket Head Bolt 5C 9 #
24 L. Tighten all components securely unless otherwise noted. Step 3: Assemble and Install The Aileron Bell Cranks Parts required:
25 1 #0019 M3 Locknut 5E Refer to Drawing #5D A. Select two #0636 Flanged Ball Bearings, one #0862-4 Brass Spacer Ring, an
26 VI. BUILDING AND INSTALLING THE LANDING GEAR Bags Required: #6A and #6B Tools or Materials Required: M2.5 Allen tool Small
27 D. Examine the drawing and note the orientation of the parts as they attach to the main frame assembly. The main frame assembly will
28 VII. INSTALLATION OF THE CLUTCH, FAN AND ENGINE ASSEMBLY (INCLUDING GUIDELINES FOR ENGINE AND EXHAUST SELECTION) Bags Required: #7
29 Guidelines for Exhaust System and Fuel Selection Many choices in exhaust systems are available and their performance is directly relat
3 X-CELL LIMITED WARRANTY The warranty covers defects in material or workmanship or missing components to the original purchaser for 30
30 Y.S. .91H Qty: M.A. USA p/n Description: 1 Stock Washer 1 #0619 M10 x 16 x .50 Shim 1 #0546-6 Base collet
31 the hub. They sit Aflush@ or within 0.25mm of the top surface of the hub. Step 2: Installing the Clutch Assembly Parts Required:
32 C. Select the twenty #0009 M3 Washers, eight #0063 M3x10 Socket Head Bolts, and eight #0065 M3x12 Socket Head Bolts. Place one #0009
33 A. Select four #0003 M3 Flat Washers (large), four #0019 M3 Hex Locknuts, and four #0067 M3x14 Socket Head Bolts. Additionally, sele
34 Step 4: Installing the Fan Shroud and Switch Plate Parts Required: Bag # 5 #0029 M2.2x13.0 Phillips self-tappi
35 enough to allow adjustment. D. Select both halves of the #0548-5 Fan Shroud and two #0029 M2.2x13 Phillips self-tapping screws. Exam
36 VIII. BUILDING AND INSTALLING THE FUEL TANK ASSEMBLY Bag Required: 8 Tools or Materials Required: Modeling knife or razor
37 clunk, always maintain the exact length of 73.0mm. Frequency of service should be every six to ten gallons of fuel burned (depending o
38 IX. INSTALLING THE SWASHPLATE, WASHOUT UNIT AND ROTOR HEAD ASSEMBLY Bag Required: 9A Tools or Materials Required: M1.5 and
39 Step 2: Assembling the Washout Unit Parts Required: Bag # 1 #0057 M3x3 Socket set screw 9B 2 #0097 M3x 22
4 X-CELL FURY TEMPEST 3-D INTRODUCTION These instructions apply to Fury Tempest Kits #1023-5. Congratulations! You have purchased a qu
40 C. Select two #0869 Washout Ball Links, two #106-07 M2x16 Pivot Pins, and four #106-08 M2 Circlips (a spare is also included). Note:
41 X. BUILDING THE TAIL ROTOR ASSEMBLY Bags Required: #10A, #10B, and #10C Tools or Materials Required: M1.5 Allen tool M
42 C. Select the #122-65 Steel Tail Rotor Hub, one #0873-1 Tail Rotor Blade Mount, the remaining #0457 Thrust Bearing components, one #04
43 A. Select one #0101 M2x5 Threaded Ball and one #0437 Plastic Pitch Ring. Install the Threaded Ball into the Plastic Pitch Ring, use a
44 Step 3: Assembling the Tail Rotor Gear Box Materials and Tools Required: M1.5 and 2.5 Allen (Hex) tools A inside type@ Reta
45 Clean the following parts with thinner to remove any oil prior to assembly with Red or Green Locktite: #0427-1 Bevel Gear #0541-8
46 C. Select the previously assembled input shaft. Slide it into the tail rotor housing. NOTE: There are two M3 threaded holes at 180 d
47 XI. BUILDING THE TAIL BOOM ASSEMBLY, BOOM SUPPORTS, AND INSTALLATION ONTO THE MAIN MECHANICS Bags required: 11A through 11D To
48 C. Select two #0006 M2.5 Atoothed@ Lock Washer, four #0015 M2 Hex Nuts, two #0043 M2x12 Slotted Machine Screw, two #0477 Push Rod Guid
49 Step 2: Installing the Tail Boom Supports Parts Required Bag# 6 #0003 M3 Washers B Large 11C 2 #0093 M3x
5 High Quality Synthetic Grease (M.A./USA p/n #4707) Light oil (Teflon type M.A./USA p/n #4801) Canopy finishing materials (describe
50 E. Select two #0003 M3 Flat Washers, two #0093 M3x18 Special Phillips Bolts, and the two prepared graphite tubes (from the previous s
51 surpass the length of either Teflon tube. Mark the position of each and disconnect both ball links so that the pushrod and Teflon tube
52 XII. INSTALLING THE RADIO SYSTEM AND PUSHRODS Bags required: #12A through #12G Tools or materials required: Small Phillips
53 The following table will indicate the Servo Number, Frame Position, Receiver Connection, and Model Connection: Servo Number Frame Pos
54 Step 2: Basic Radio Programming Preliminary adjustments must be made to the radio before installing servo arms (wheels) and push rods.
55 A. Select the #122-95 push rod and two #0133-1 ball links. Install each ball link and adjust to the preliminary length of 112.7 mm (
56 Servo #4 Parts Required Bag # 1 #0015 M2 Hex Nut 12D 1 #0103 M2 x 5 threaded ball 12D 2 #0133 Bal
57 Servo #5 Parts Required Bag # 2 #0015 M2 Hex Nut 12E 2 #0103 M2x5 Threaded Ball 12E 2 #0133
58 Step 4: Installing the Swashplate Lower Push Rods Parts Required Bag # 6 #0133 Ball links (long) 12F 3 #0227 M2x42 Pu
59 Step 6: Installing the Ball Bearing servo Output Supports Important Note: Futaba and Hi-Tech servos require an M2.6 threaded fastener
6 ASSEMBLY INSTRUCTIONS Please take the time to review all instructions and drawings before building the kit. Each step will list bags,
60 XIII. PREPARING THE CANOPY Bag required: 13A Tools or materials required: Slow cyanoacrylate glue (CA) (Optional) Pai
61 Step 2: Canopy Finishing Suggestions At your option, the canopy can be used in the Awhite@ form provided or painted to your choice.
62 Table 3: Finishing Methods and Procedures Painting Finish Choice: Clear-coat Method Non Clear-coat Method Characteristics: Longer co
63 XIV. ROTOR BLADE SELECTION It is recommended that a blade length of 680mm to 700mm be used. A good quality rotor blade is suggested.
64 Table 4: Initial Pitch/Throttle Settings Desired Flying Style/Type Throttle/Collective Low Stick Position Throttle/Collective Half St
65 XVII. PRE-FLIGHT INFORMATION At home: Be sure you have all necessary equipment to operate or service the model. Be sure all b
66 XIX. FIRST FLIGHT ADJUSTMENTS Before flying double check direction of each control; tail rotor compensation direction and gyro direct
67 We wish you good luck and many happy hours of flying! If you have any further questions, feel free to call us. MINIATURE AIRCRAFT USA
68 Tempest 3D Instruction Manual Document Revisions Rev 1 – Initial Issue 06/24/2003 SEK Rev 2 – changes per T. Schoonard 06/04/2003 SEK
7 ASSEMBLY SEQUENCE SUMMARY Section: Subassembly: I Building the Rotor head II Building the Left Main Frame III Installing the
8 I. BUILDING THE ROTOR HEAD Bags Required: #1A through #1G and Bag #11A Tools or materials required: Small Phillips screwdriv
9 D. Select two #0067 bolts and temporarily thread each into holes provided near the base of the head block. Note that even though the ho
Comentarios a estos manuales